A 140-foot cedar fence line beside a price breakdown of material, posts, labor, gates and tear-out

Every month starts in the hole. The truck payment, the insurance, the phone, the shop and your own pay come due whether you sell $5,000 of work or $50,000. Break-even is the sales figure that fills that hole exactly. The Small Business Administration defines it as the point at which total cost and total revenue are equal, with no loss or gain. Below it, each month costs you money; above it, the margin on each job is profit. Here is how to work it out in a contractor’s terms, and what moves it.

The formula, in contractor terms

The SBA gives two versions. In units: fixed costs divided by the price per unit minus the variable cost per unit. In sales dollars: fixed costs divided by the contribution margin, where the contribution margin is the price minus the variable cost, divided by the price.

For a contractor, a unit is a job, the variable costs are the job’s direct costs (materials, crew wages and their payroll taxes, subcontractors, dump fees, permits, equipment rented for that job), and the contribution margin is the gross margin: the share of each job’s price left after its direct costs. So:

  • Break-even sales = monthly fixed costs ÷ gross margin percentage.
  • Break-even jobs = monthly fixed costs ÷ gross margin dollars on an average job.

If margin and markup still get mixed up in your shop, read Markup vs. Margin first; this formula uses margin, and using markup in its place makes the answer too low.

Step one: the fixed costs, by the month

The SBA describes fixed costs as costs that do not change as production goes up or down, and lists rent, salaries, property taxes, insurance, interest and depreciation as examples. Its calculator works by the month, so a bill paid quarterly or yearly goes in at its monthly share. Some costs are half and half: the SBA calls them semi-variable and names telephone service, repairs, fuel and power among them, and says to split each into its fixed part and its variable part where you can. A truck’s payment and insurance are fixed; the fuel it burns on a job is that job’s cost.

Two items get left out more than any others. The first is your own pay. A break-even that leaves out the owner’s salary is the point at which you work for free; put in what you need to take home, as The Owner’s Pay describes. The second is everything that is not on a monthly bill: the accountant, license renewals, the annual software plan. The SBA’s own tip is to add a little extra, say 10%, for expenses you cannot predict.

Step two: the gross margin on a typical job

Take your last ten or twenty finished jobs, add up their prices, add up their direct costs, and divide what is left by the prices. That is your real gross margin, which may differ from the one you price for. If you have no job-by-job records yet, Job Costing shows how to start, and the overhead side is worked out per hour in Overhead per Billable Hour.

Step three: divide

Say a painting contractor with one employee has these monthly fixed costs. Every figure is an example; put in your own.

Monthly fixed costs (example)Amount
Truck payment$850
Insurance, monthly share$650
Phone, software and website$250
Shop and storage rent$800
Accountant, licenses and bank fees, monthly share$300
Advertising$600
Owner’s pay$5,500
The SBA’s 10% cushion$895
Total$9,845

Direct costs run 55% of the price, so the gross margin is 45%. Break-even sales are $9,845 ÷ 0.45 = about $21,878 a month, or about $5,049 a week (the monthly figure times 12, divided by 52), or about $262,500 a year. With an average job of $1,500, each job leaves $675 of margin, and $9,845 ÷ $675 = 14.6, so the fifteenth job of the month is the first one that makes a profit.

What moves the number

Run the same shop through three changes:

Change (example)Margin per jobJobs to break evenSales to break even
As above$67514.6$21,878
Prices up 5%, same work$75013.1$20,675
A 10% discount on every job$52518.8$25,316
A second truck: $1,070 more a month, plus the 10% cushion$67516.3$24,493

The price lines are not mirror images. A 5% rise cuts the jobs needed by about 10%, because the whole $75 lands on the margin. A 10% discount takes $150 off a $675 margin, and the shop needs about 29% more jobs just to stand still. That is the arithmetic behind Raising Your Prices and against the habit of discounting to win work. The truck line is the test for any new fixed cost: it has to bring in close to two more jobs a month before it pays for itself, which is worth knowing before you sign (Buying or Leasing the Work Truck).

Break-even is a yearly number, too

Fixed costs run twelve months a year, but many trades sell in fewer. If the painter above sells exterior work for nine months, the year’s fixed costs of $118,140 still need about $262,500 of sales, which works out to about $29,170 in each working month instead of $21,878. The slow months are paid for by the busy ones, so the busy-season target has to carry them. How to hold the cash across that gap is in Seasonal Cash Flow and Cash Flow for Contractors.

A reality check from the Census Bureau

Compare your break-even with what businesses like yours really take in. The Census Bureau’s Nonemployer Statistics count businesses with no paid employees, drawn mainly from business income tax returns; outside construction they leave out businesses with less than $1,000 of receipts, but in construction they do not. The 2023 file shows:

  • 1,928,748 specialty trade contractors without employees (NAICS 238), with total receipts of about $138.4 billion, an average of about $71,700 each.
  • 48.7% of them took in less than $25,000 for the year, and 2.2% took in $500,000 or more.
  • By trade group: plumbing, heating and air-conditioning contractors (NAICS 23822) averaged about $78,400; electrical contractors (23821) about $57,500; building finishing contractors such as painters, drywallers and flooring installers (2383) about $65,700.

An average mixes part-timers with full-time operators, so it is not a target. But it is a warning. The example shop’s break-even of about $262,500 a year is more than three times what the average specialty contractor without employees took in. That shop can carry those costs only because it has a crew producing the sales. A solo operator who signs up for the same truck, shop and advertising is betting on receipts few one-person businesses reach. Keep the fixed costs in line with the work you can actually produce, then check the number every week alongside the others in The Five Numbers to Look at Every Week.

Sources

  1. Calculate your startup costs (break-even point and break-even analysis), U.S. Small Business Administration (accessed October 22, 2026)
  2. Nonemployer Statistics 2023, U.S. file (nonemp23us), U.S. Census Bureau (accessed October 22, 2026)
  3. NAICS 2017 code descriptions used in County Business Patterns, U.S. Census Bureau (accessed October 22, 2026)
  4. Nonemployer Statistics: United States record layout (receipts in thousands of dollars; receipts size classes), U.S. Census Bureau (accessed October 22, 2026)
  5. Nonemployer Statistics: Methodology, U.S. Census Bureau (accessed October 22, 2026)

Where this comes from

Written by the team at Tailgate Office, LLC. Every figure comes from the sources listed above, as of the day each was accessed; prices and rules change without warning. Nothing here is legal, tax or financial advice.

Field Notes by email

One email a week with the week's Field Notes. Unsubscribe in one click. We never sell or share your address.

We email you a link to confirm first. What we keep, and for how long.

Keep reading

A 140-foot cedar fence line beside a price breakdown of material, posts, labor, gates and tear-out
Pricing

Overhead per Billable Hour: The Number Under Every Price

The truck, the insurance and the phone never show up on a job, so they have to ride on every hour you sell. How to total a year of overhead from your Schedule C, divide it by the hours you really bill, and why the busy season has to carry the slow one.

A 140-foot cedar fence line beside a price breakdown of material, posts, labor, gates and tear-out
Pricing

Moving Estimates: Binding, Non-Binding and Not-to-Exceed

For a move across a state line, federal rules allow two written estimates, binding and non-binding, and cap what a non-binding one collects at delivery at 110%. What each commits you to, the papers the customer gets, how Texas and California handle local moves, and pricing the hourly job.

A 140-foot cedar fence line beside a price breakdown of material, posts, labor, gates and tear-out
Pricing

Pricing Flooring: Material Families, Tear-Out and Subfloor Prep

Square feet times a rate only works once you have one rate per way the floor goes down. How to set those rates, price tear-out by what comes up, and turn moisture tests, leveling and an old-tile asbestos check into lines instead of losses.