“Do I need a license in Georgia?” That depends on what you build and how big the job is. Georgia licenses contractors through two boards under the Secretary of State. The State Licensing Board for Residential and Commercial General Contractors, under Title 43, Chapter 41 of the Official Code of Georgia (O.C.G.A.), covers building and remodeling. The State Construction Industry Licensing Board, under Chapter 14, licenses electrical, plumbing, conditioned air, low voltage and utility contractors. A long list of specialty trades needs neither. This is Georgia in detail; the method for any state is in Do I Need a Contractor License?

Two recent changes explain the names you will see. A 2024 amendment, effective July 1, 2024, turned the “general contractor” license into the “commercial general contractor” license and renamed the board to match. And Chapter 14 was rewritten with a section for each trade, effective July 1, 2026. Older guides and forms may still use the old names.

The $2,500 line

A residential contractor needs a license where “the total value of the work or activity or of the compensation to be received by the contractor for such activity or work, whichever is the higher, exceeds $2,500.00” (§ 43-41-2(9)). Note “whichever is the higher.” The test is not only what you are paid, so a small labor-only price does not settle the question when the work itself is worth more. Without the license, no individual or business “shall have the right to engage in the business of residential contracting” (§ 43-41-17(a)).

The three licenses

LicenseWhat it coversExperience to applyContinuing education, up to
Residential-basicDetached one- and two-family homes and one-family townhouses not over three stories, and their accessory buildings and structuresTwo years of verifiable experience under a licensed residential contractor, mainly residential-basic work, or substantially similar experience3 hours a year
Residential-light commercialAll of the above, plus multifamily and multiuse light commercial buildings under four stories and under 25,000 square feet of wood or light-gauge metal frame, brick veneer, prefabricated or manufactured construction, or pre-engineered steel buildings up to 50,000 square feet, excluding listed special-hazard buildingsA relevant four-year degree; or four years of college courses and experience combined; or four years of construction experience, two of them with a residential contractor6 hours a year
Commercial general contractorAny type of work, subject to the financial limits of any subclassificationA relevant degree, or four years combined, or four years of experience, including two with a commercial general contractor and one in work such as estimating, supervision or project management8 hours a year

The definitions are in § 43-41-2(3), (10) and (11), the experience rules in § 43-41-6(b) to (d), and the continuing education limits in § 43-41-6(k). Every applicant must be at least 21. The board’s rules set general liability insurance of at least $300,000 for residential-basic and at least $500,000 for residential-light commercial (Rules 553-3-.01 and 553-3-.02), plus workers’ compensation as Georgia law requires; the state thresholds are covered in Workers’ Comp: When Your State Requires It.

Applying, and the LLC question

  • Two ways to hold it. You apply either as an individual, working in your own name or a trade name as a sole proprietor, or as the qualifying agent of a business organization (§ 43-41-6(a)).
  • An LLC needs a qualifying agent. It is unlawful to operate a business organization in residential or commercial general contracting without a license, and the license is issued to the qualifying agent and the business together (§ 43-41-9(a)). The agent swears to having final approval authority over the construction, contracts and finances of each job for which the agent’s license was used to obtain the building permit (§ 43-41-9(b)).
  • If your only agent leaves, the business has 180 days to employ another and apply under the new agent (§ 43-41-9(e)(1)).
  • The exam. Residential-basic and residential-light commercial each have their own exam, covering plans and specifications, building codes, estimating, contracting, and Georgia law on workers’ compensation, insurance and liens (§ 43-41-6(f)(2)).
  • Keeping it. Licenses renew every two years (§ 43-41-6(i)), and a licensee must tell the division in writing within 30 days of changes to its address, insurance coverage or affiliated entities (§ 43-41-6(e)(4)).

Trades that do not need this license

Specialty contractors. Chapter 41 does not stop a specialty contractor from contracting directly with an owner for its own trade (§ 43-41-17(f)), and the board keeps a list of those trades. Its traditional specialty list, revised in March 2020 and described by the board as under development and subject to change, includes shingles and shakes, flat roofing and sheet metal roofing (roofing), siding, gutters and downspouts, fencing, painting and special coatings, masonry, concrete cast in place, insulation, drywall, ceramic tile, wood flooring, cabinets and countertops, windows, overhead doors, landscape and irrigation, asphalt paving and demolition.

A specialty contractor may also take on other work that would otherwise need a license, if it is incidental to and an integral part of the specialty work and does not exceed the greater of $10,000 or 25 percent of the total contract value at signing (§ 43-41-17(f)). Say a roofer signs a $14,000 reroof: 25 percent is $3,500, so the $10,000 figure is the limit for that other work. The exemption never covers work that needs a Chapter 14 license.

Repair work. Anyone may do repair work for an owner without this license, provided they tell the owner they do not hold a license under Chapter 41 and the work does not affect the structural integrity of the property; the board defines “repair” by rule (§ 43-41-17(g)). The disclosure is not a formality. In Fleetwood v. Lucas (2020), the Court of Appeals held that the repair exception did not apply because the contractor had not disclosed being unlicensed. A handyman relying on it should put the disclosure in writing on every estimate.

Others. An owner building for their own use, not for sale or lease (§ 43-41-17(h)); agricultural buildings (§ 43-41-17(k)); and manufactured home installation (§ 43-41-17(n)).

Electrical, plumbing, HVAC and low voltage: the other board

The State Construction Industry Licensing Board has five divisions: conditioned air, electrical, low voltage, master and journeyman plumbers, and utility contractors. A residential or commercial general contractor may include their work in a contract but may not perform it; it “shall only be performed by a person who is duly licensed” under Chapter 14 (§ 43-41-2(3) and (9)). In Restor-It, Inc. v. Beck (2019), a remodeling contract that included electrical and plumbing work by a contractor without those licenses was held unenforceable under § 43-41-17(b).

  • Electrical. No electrical contracting without a license from the division (§ 43-14-8(b)(1)). There are two classes; the Class II experience requirement includes installations exceeding single phase, 200 amperes (§ 43-14-8(f)). An unlicensed person may not advertise electrical contracting unless the work is performed by a licensed electrical contractor (§ 43-14-8(b)(2)).
  • Plumbing. Plumbing contracting requires a Master Plumber Class I or Class II license, and no one without one may advertise plumbing contracting (§ 43-14-13(b), (d)).
  • Conditioned air (HVAC). A license is required, with the same advertising rule (§ 43-14-14(b), (d)). A subcontractor installing duct systems, controls or insulation under a licensed conditioned air contractor’s contract does not need that license; the conditioned air contractor stays responsible for the work (§ 43-14-19(f)(1)).
  • Low voltage. Four classifications: general (LV-G), telecommunications (LV-T), alarm (LV-A) and unrestricted (LV-U) (§ 43-14-9(c)).

A Chapter 14 licensee may contract directly with an owner for incidental building work, up to the greater of $10,000 or 25 percent of the contract (§ 43-41-17(e)). Chapter 14 licenses are good statewide, and a city or county may not add its own licensing requirements, except as § 43-14-16 provides (§ 43-14-19(b)). A homeowner may do this work on a home they own or occupy, to code and inspection (§ 43-14-19(d)(1)). One rule touches your marketing: licensees must show the registration or certificate number on commercial vehicles used only in the business, show it (or a website address where it can be found) on advertising, and print it on invoices and proposal forms (§ 43-14-18(b)). The wider picture is in Your License Number in Ads.

What working without the license costs

  • You cannot enforce the contract. A contract for work that needs a Chapter 41 license, signed with an unlicensed contractor, “shall be unenforceable in law or in equity by the unlicensed contractor,” and no lien or bond claim exists for that contractor’s labor, services or materials (§ 43-41-17(b)). Lien rights in general are in Mechanics’ Liens for Small Residential Contractors.
  • No permit. A building inspector may not issue a permit for work that requires a licensed residential or commercial general contractor until the applicant gives a license number (§ 43-41-14(a)(1)).
  • Licensed means one license statewide. A licensee may work throughout Georgia, and cities and counties may not add licensing requirements for work the chapter covers, apart from local programs in effect on July 1, 2004 that the board judged at least as strict (§ 43-41-17(c)).
  • A written warranty goes with the license. A licensed residential contractor must offer a written warranty with each contract to build, or manage the building of, a single-family residence where the work or the pay exceeds $2,500; the residential division sets the minimum terms (§ 43-41-7).

Four things to do

  1. List every service on your website and match it to a specialty trade, a Chapter 41 license or a Chapter 14 license, including small add-ons such as an outlet or a fixture swap.
  2. If you work through an LLC or corporation, check that the license is issued to the business through a qualifying agent, not only to you as an individual.
  3. Check every electrician, plumber and HVAC sub’s Chapter 14 license before they start, and keep a copy in the job file.
  4. If you rely on the repair exemption, put the “not licensed under Chapter 41” disclosure in writing on each estimate.

General information, not legal or tax advice. Rules change and vary by state; check with the agency named above or a professional for your situation.

Sources

  1. O.C.G.A. § 43-41-2, Definitions (2025 Georgia Code, with amendment notes), Justia (accessed October 22, 2026)
  2. O.C.G.A. § 43-41-6, Application; eligibility for licensure; examinations; renewal; continuing education, Justia (accessed October 22, 2026)
  3. O.C.G.A. § 43-41-7, Written warranties required, Justia (accessed October 22, 2026)
  4. O.C.G.A. § 43-41-9, Licensing; qualifying agents, Justia (accessed October 22, 2026)
  5. O.C.G.A. § 43-41-14, Role of building inspectors, Justia (accessed October 22, 2026)
  6. O.C.G.A. § 43-41-17, Unenforceable contracts; local requirements; exceptions, Justia (accessed October 22, 2026)
  7. Ga. Comp. R. & Regs. Chapter 553-3, Qualifications for Licensure, Residential Contractor Division, Georgia Secretary of State (accessed October 22, 2026)
  8. Traditional Specialty Contractors Policy Statements (revised 03/06/20), Georgia Secretary of State, State Licensing Board for Residential and Commercial General Contractors (accessed October 22, 2026)
  9. About the Georgia State Board of Electrical Contractors, Georgia Secretary of State (accessed October 22, 2026)
  10. O.C.G.A. § 43-14-8, License requirements for electrical contractors (effective July 1, 2026), Justia (accessed October 22, 2026)
  11. O.C.G.A. § 43-14-9, License requirements for low voltage contractors (effective July 1, 2026), Justia (accessed October 22, 2026)
  12. O.C.G.A. § 43-14-13, License requirements for plumbing contractors (effective July 1, 2026), Justia (accessed October 22, 2026)
  13. O.C.G.A. § 43-14-14, License requirements for conditioned air contractors (effective July 1, 2026), Justia (accessed October 22, 2026)
  14. O.C.G.A. § 43-14-18, Display of license and registration or certificate number (effective July 1, 2026), Justia (accessed October 22, 2026)
  15. O.C.G.A. § 43-14-19, Applicability of chapter (effective July 1, 2026), Justia (accessed October 22, 2026)

Where this comes from

Written by the team at Tailgate Office, LLC. Every figure comes from the sources listed above, as of the day each was accessed; prices and rules change without warning. Nothing here is legal, tax or financial advice.

Field Notes by email

One email a week with the week's Field Notes. Unsubscribe in one click. We never sell or share your address.

We email you a link to confirm first. What we keep, and for how long.

Keep reading

A two-column checklist of contractor texts that are fine to send and texts that are not
Compliance

Pennsylvania's Home Improvement Contractor Registration

Pennsylvania's home improvement law in plain words: who registers with the Attorney General, the $100 fee and the insurance minimums, what every contract must say, the one-third deposit cap and the three-day cancel right, and Philadelphia's own rules.

A two-column checklist of contractor texts that are fine to send and texts that are not
Compliance

Contractor Licensing in New York: No State License, but Local Ones

New York has no statewide home improvement license, but New York City and five counties do, and one state contract law covers jobs over $500. Who licenses what, the fees and insurance in the city, Nassau, Suffolk and Westchester, and the contract and escrow rules.

A two-column checklist of contractor texts that are fine to send and texts that are not
Compliance

Contractor Licensing in Maryland: The MHIC License

Maryland licenses home improvement work through its Home Improvement Commission. What counts as home improvement, who needs a contractor or salesperson license, the exam, the $500,000 insurance rule and the fees, the separate trade boards, the Guaranty Fund, and what every contract must say.

The office your truck never had.